Project Components

Below is a list of the key Project Components for the Tenas Project. Much of what is listed below is typical for a small mining project. This list is subject to change.

Overview

  • Open Pit Operation
  • Conventional Excavator/Truck Operation
  • Producing 775,000 to 825,000 t/year of metallurgical coal for sale
  • Expected Mine Life (construction to completion of reclamation) is 25 years
  • Expected Footprint of operation (including rail, powerline, and Bypass road) ~1,050 ha

Transportation

  • An 11 kilometre Bypass Road for mine traffic once constructed
  • Rail infrastructure that includes a 2.5 kilometre rail loop connection to the existing CN Railway line
  • Improvements to 6.5 kilometres of existing forestry service roads
  • Haul roads and access roads within the minesite

Mine Infrastructure

  • Coal Processing Plant
  • Coal handling systems for run of mine coal, processed rock, and processed coal (including plant conveyors, storage bins, and stockpiles)
  • Storage piles for rock, processed rock, and overburden and stockpiles for topsoil, processed coal and processed rock
  • Administration, first aid, maintenance, mine dry, laboratory, light vehicle, mine rescue, and warehouse buildings
  • Surface water management infrastructure (ditches, sedimentation, control, management, and storage ponds)
  • Water supply wells, storage, and distribution network
  • Fuel and lubricant storage facilities and distribution network
  • Explosives magazine, storage silos, and vehicle wash and maintenance facilities
  • Propane storage facilities and distribution network
  • Solid waste management systems including landfill, recycling and composting facilities
  • A 3.5 km long 25 kV powerline and a 25 kV to 600V substation adjacent to the Coal Processing Plant
  • A permanent bridge over Goathorn Creek